Ongoing Project In progress

Soyo–Cabinda Submarine Cable

Client
Odebrecht (OEC)
Location
Soyo and Cabinda, Angola
Status
In progress

Description

220 kV interconnection between Soyo and Cabinda, Angola, via a high-voltage submarine cable – Lots 2 and 3 (onshore sections).

Main scope
• Qualified technical team leading the design engineering firms in developing technical specifications and basic and detailed designs

Additional information

End client: RNT
Contract term: April 2026 to April 2027
Current workforce: 3 substation and transmission line specialists
Physical progress: 15% (July 2026)