Caculo Cabaça Hydropower Plant
- Client
- CGGC – Energy China
- Location
- Cuanza Norte, Angola
- Status
- In progress
Description
Caculo Cabaça Hydropower Plant in Angola, with 2,172 MW of installed capacity (4 × 543 MW).
Main scope
• Professional technical consulting services for electrical, mechanical and civil works integration and interfaces
• Team of specialists: mechanical engineer, electrical engineer and civil engineer
Additional information
End client: GAMEK
Contract term: December 2025 to December 2026
Current workforce: 3 specialists
Physical progress: 15% (July 2026)